How Long Does It Take To Charge A Chevy Volt At A Level 2 Charging Station?

How much does a Level 2 charger cost?

The price of a Level 2 charger designed for a single user can range from $400 to $4000, while chargers designed for multiple users (where more than one electric vehicle owner uses the charger or more than one vehicle chargers at the same time) range from $2200 to $16,000..

How much does it cost to install a Level 2 charging station?

A Level 2 charger will cost a bit more: The station will cost roughly $500 to $700, and the parts and labor will likely cost $1,200 to $2,000. The installation process could cost more if your main point of charging will require major electrical upgrades.

Can you plug a Chevy Volt into a regular outlet?

Charging the Chevy Volt at Home All you need to do is use the cord that comes with the vehicle to plug the car into a regular wall outlet. Doing this will add about 4 miles of range per hour of charging, fully recharging your Chevy Volt battery in about 12 hours.

Do you really save money with electric cars?

The fuel cost savings If you do an internet search for electric car savings, the vast majority of hits will be the savings on fuel cost. This makes sense in that you will probably pay more for the EV and expect to make it back by fuel savings. In all but a few extreme cases, fuel costs will favor EVs.

How much is ChargePoint per hour?

Cost Per Charge: There are no setup, termination, or session fees. All Leve 2 charging is $1.50 per hour. For DC Quick Charging, the pay-as-you-go plan costs $0.20/minute. If you are a member at $9.99 per month, the cost drops to $0.15/minute.

Is a Level 2 charger worth it?

If you do not drive much or your vehicle’s electric range is less than 20 miles, a Level 2 charging station is probably not worth the cost. … You can also ask them for a quote to install the minimum recommended circuit for your vehicle from Table 2, but the savings are not likely to be significant.

Can you install a Level 3 charger at home?

Level 3 charging stations, or DC Fast Chargers, are primarily used in commercial and industrial settings, as they are usually prohibitively expensive and require specialized and powerful equipment to operate. This means that DC Fast Chargers are not available for home installation.

Is it cheaper to charge EV at home?

Charging an EV at home is usually the cheapest way to go, though you may incur some added costs to make the process more efficient. Depending on the type of public charging station you use, replenishing the battery on the road can either be free or surprisingly costly.

How long does it take to charge a Chevy Volt at a charging station?

around 13 hours120-Volt Charger: The Chevy Volt comes standard with a 120-volt portable charge cord, which can simply be plugged into a regular 3-pronged wall outlet. With a charging speed of around 4 miles per hour, this setup lets you get up to a full charge in around 13 hours.

What is the difference between Level 1 and Level 2 charging?

Level 2 charging adds about 25 miles of Range Per Hour (RPH), while Level 1 charging only adds about 4 miles of Range Per Hour. Because it takes nearly a full day to charge an EV, Level 1 is just too slow for the amount of time that most drivers spend at a typical business, so it won’t attract them.

How much does it cost to charge a Chevy Volt at a charging station?

The cost to charge a Chevy Volt depends on electric rates where you live. Around the U.S., electric rates generally range from around 10 to 20 cents per kWh. This means that, in general, it will likely cost you somewhere between around $2-5 to charge your Chevy Volt from empty.

Can a Chevy Volt run on gas only?

Yes, the GM Chevrolet Volt is what is known as a Plug-In Hybrid Electric Vehicle (PHEV). This means it can be operated strictly on gasoline alone or both gasoline (Premium is specified) and stored electricity in the 16.5 kWh to 18.4 kWh onboard battery depending on the year of manufacture.